Showing posts with label ARMORED VEHICLES. Show all posts
Showing posts with label ARMORED VEHICLES. Show all posts

Friday, December 13, 2013

DTN News - RUSSIA DEFENSE NEWS: Russia Buys New Aircraft, Armored Vehicles and Missiles

Asian Defense News: DTN News - RUSSIA DEFENSE NEWS: Russia Buys New Aircraft, Armored Vehicles and Missiles
Source: DTN News - - This article compiled by K. V. Seth from reliable sources By Jaroslaw Adamowski
(NSI News Source Info) TORONTO, Canada - December 13, 2013: Russia’s military will acquire more than 210 new planes and helicopters, over 250 armored vehicles and more than 40 intercontinental ballistic missiles in 2014, President Vladimir Putin announced. The ongoing program to modernize the Russia’s military armament has developed “a good rhythm of work,” Putin said, according to local daily Kommersant.

The announcement came Tuesday at the meeting of the Russian Defense Ministry’s board in the presence of Defense Minister Sergei Shoigu. The acquisitions will be part of the country’s plan to spend US $650 billion on new arms and military equipment by 2020.

Putin said that Russia might be facing a number of potential security threats and challenges in the near future. These include armed conflicts in the Middle East, the withdrawal of international forces from Afghanistan, and plans to expand US missile defense to Europe. He also noted the Russian Navy would need to protect the country’s security and interests in the Arctic.

Shoigu said that, along with procurements of new arms, there was a necessity to intensify the training of troops. In 2013, Russia’s armed forces acquired 56 planes, 122 helicopters, 260 tanks, 112 armored infantry fighting vehicles, 279 armored personnel carriers, six vessels, a submarine, and a number of missile and gun systems, the defense minister said.

The Russian Navy missile cruiser Marshal Ustinov is expected to rejoin the fleet in 2015 following delays in the warship’s refit, the Zvezdochka shipyard said Friday.

The Marshal Ustinov, a Slava-class missile cruiser, was launched in 1982 and commissioned with the Russian Northern Fleet in 1986. It has been undergoing a refit at the Zvezdochka shipyard in northern Russia since 2011.

The completion of the work, which included repair of the propulsion system and overhaul of the ship’s missile, communications and navigation systems, was originally scheduled for 2014. However, diagnostics revealed that the majority of electrical cables on the vessel must be replaced, the yard said.

*Link for This article compiled by K. V. Seth from reliable sources By Jaroslaw Adamowski
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*Photograph: IPF (International Pool of Friends) + DTN News / otherwise source stated
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS

Sunday, December 11, 2011

DTN News - BRITISH MINISTRY OF DEFENCE NEWS: The Cost-Effective Delivery of An Armoured Vehicle Capability - Summary

Asian Defense News: DTN News - BRITISH MINISTRY OF DEFENCE NEWS: The Cost-Effective Delivery of An Armoured Vehicle Capability - Summary
Source: DTN News - - This article compiled by Roger Smith from reliable sources British MoD &KMW Krauss-Maffei Wegmann
(NSI News Source Info) TORONTO, Canada - December 11, 2011: Armoured vehicles such as tanks, reconnaissance and personnel-carrying vehicles are essential for a wide range of military tasks.

Since the 1998 Strategic Defence Review, the Ministry of Defence (the Department) has attempted to acquire the vehicles it needs through a number of procurement projects.

However, none of the principal armoured vehicles it requires have yet been delivered, despite the Department spending £1.1 billion since 1998, including £321 million wasted on cancelled or suspended projects. As a result there will be gaps in capability until at least 2025, making it more difficult to undertake essential tasks such as battlefield reconnaissance.

Partly as a result of this £1.1 billion failure to yet deliver any armoured vehicles, and to meet the specific military demands of operating in Iraq and Afghanistan, the Department was provided with a further £2.8 billion from the Treasury Reserve to buy Urgent Operational Requirements (UOR) vehicles. The Department has used the faster UOR process to deliver mine-resistant vehicles for operations.

However, these vehicles are expensive and are designed for specific circumstances, so will not meet the wider requirements identified in the recent Strategic Defence and Security Review (SDSR). Delays to the delivery of the principal armoured vehicles have meant that other equipment, such as helicopters and other vehicles, have been used more frequently to undertake tasks such as battlefield reconnaissance and transporting personnel. Using helicopters and other vehicles in this way can be less effective and may divert expensive military assets from other essential tasks.

Over the past six years, the Department has removed £10.8 billion from armoured vehiclebudgets up to 2021. Armoured vehicles projects have suffered more severe budget cuts than other equipment projects, largely because they involve lower levels of contractual commitment and are therefore easier to cut. This has left £5.5 billion available for the next ten years, which is insufficient to deliver all of the armoured vehicle programmes which are planned.

The Department needs to be clearer about its priorities, and stop raiding the armoured vehicles chest every time it needs to make savings across the defence budget. The Department acknowledges that it has been both indecisive and over-ambitious in setting vehicle requirements, and that the ways it has sought to procure armoured vehicles have been too complicated.

The Department will need to set more realistic requirements in future if it is to deliver projects on time and to budget. We are also concerned that the Department was unable to identify anyone who has been held to account for the clear delivery failures. It is critical the Department has named senior staff with the necessary powers and sufficient time in post to take proper responsibility for and be held accountable for such projects.

The Department has yet to balance its defence budget fully and devise a plan to close capability gaps, despite having conducted the SDSR and two subsequent planning exercises. The Department needs to determine its armoured vehicle equipment priorities and deliver these as rapidly and cost-effectively as possible, including making an assessment of which of its existing vehicles should be retained after combat operations in Afghanistan cease.

On the basis of a Report by the Comptroller and Auditor General, we took evidence from the Ministry of Defence on its progress in delivering armoured vehicles.

Click here for the full report (40 pages in PDF format) on the Parliamentary website.




*Link for This article compiled by Roger Smith from reliable sources
*Speaking Image - Creation of DTN News ~ Defense Technology News
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News

©

COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS